Joined
·
422 Posts
I wrote to an email to steeda asking about the time frame for an intake system, heres the response:
Edgar,
Our engineers have a model designed. We are currently doing some dyno
testing. The part should be ready for release by December.
Chris Pelkowski
Sales Associate
(954) 960-0774 ext 1168
(229) 249-8802 Fax
[email protected]
Edgar,
Our engineers have a model designed. We are currently doing some dyno
testing. The part should be ready for release by December.
Chris Pelkowski
Sales Associate
(954) 960-0774 ext 1168
(229) 249-8802 Fax
[email protected]