|
SVT told me that the last day the svtf was built was on april 22, 2004, the day mine was built. my car #1978 (the last 3-door) and #1079 (the last 5-door) were built on the 22 of april, 2004.....that means mine HAD to be close to the end of the production line (the last day, to be exact). when they made them the 3 & 5-doors had to be on the line at the SAME TIME!don't mean to sound angry, but i am on percoset for a hand injury, and i can't believe nobody knows at SVT what order the cars were built!
They can tell me that the last 5-door was after mine though!
|