Quote:
Originally Posted by suss6052
Actually 4/2/12 doesn't correspond to the start of job 2 builds at all. That date was on or after 3/5/12 as the start of job 2 builds. So afaik it's just a random point one month into job 2 production.
|
Actually? Note that I didn't say that it corresponded to the "start" of Job 2.
3/5 was the beginning of Job 2, and not an exact cutoff. There were changes occurring from that date until at least the middle of April, as older parts were phased out.
Just ask those folks who got the original headrests up until mid-April. Are you sure other parts or procedures were not "phased out" the same way? If not, I don't see how you can state with certainty that the date "doesn't correspond at all". The Job 2 changeover description even states that 3/5 was not an exact cutoff date, and 4/2 corresponds to the time period where some changes were still being made.