rear brake lines finished
gas pedal mounted in its new location since the tunnel is so much larger than factor it would not fit where it was.
trans cooler mounted. will be installing a fan off a gsxr on it later
put new non locking hood pins on it cause i was tired of messing with the others and didnt trust them to hold the hood at high speeds
was finally able to finish and paint the new core support since the hood pins are done
trans is almost done. i have completely assembled except for valve body. i am missing my old valve body and it had my governor lines and valves in it so im stuck at the moment. i have to go to a salvage yard and get another, must have lost it in the move